This post will guide you step-by-step through the assembly of the Reviertech Pheasant Feeder.
What materials do you need:
- Reviertech Pheasant Feeder Kit
- 3x universal screws with pan head (4x12mm or 4x16mm)
- KG pipe DN160 / DN200 with socket (length as required, 65cm = approx. 20l)
- Cordless drill and suitable bit
- Optional for foot set
- 12 universal screws with pan head (4x12mm or 4x16mm)
- 20mm pipe (length depending on desired height)
- 3.5mm metal drill bit
1. Shorten the pipe to the desired length and lubricate the sealing rubber with lubricant or dish soap.
| DN 160 | Feed Volume | DN 200 | Feed Volume | |
| 50cm | 10 Liters | 32cm | 10 Liters | |
| 75cm | 15 Liters | 65cm | 20 Liters | |
| 100cm | 20 Liters | 80cm | 25 Liters |
2. Insert the pipe module with the beveled side facing inwards into the pipe. It should sit approx. 5mm deeper than the pipe end, so no dripping water collects.

3. Now, screw the pipe module to the pipe with the three universal screws, positioning the screws 2cm above the pipe end, approximately every 120 degrees.

4. Place the lid on the other end, and the feeder is ready.
The feeder can be attached to a post or tree. Optionally, it can also be set up freestanding with our foot set.
To assemble the foot set, proceed as follows.
1. The three pipe foot holders are carefully screwed to the pipe at the upper end of the socket at 120-degree intervals with the universal screws.
2. The 20mm pipe is shortened to the desired length and inserted into the pipe foot holders (at 60cm, the feed opening is approx. 40cm above the ground).
3. The feet are inserted at the other end of the pipes, and the feeder is placed on a flat surface.


4. The pipes are screwed to the holders and feet with one universal screw each. For this, the pipe must be pre-drilled with a 3.5mm drill bit.
The pheasant feeder is ready!

0 comments